File #: 15-6728    Version: 1
Type: Contract Status: Passed
File created: 6/17/2022 In control: City Commission
On agenda: 7/5/2022 Final action: 7/5/2022
Title: Request approval of the Task Authorization with Mead & Hunt to design and permit the replacement of Lift Station #7 Waycross in accordance with their agreement #PW 2020-09 for Continuing On-Call Water & Wastewater Utility Line Engineering Services in the amount of $109,076.00. - Steven Danskine, PE, Public Works/Deltona Water (386) 878-8998. Strategic Goal: Infrastructure
Attachments: 1. DT Lift Station #7 Replacement Scope 5.5.22_bmf_final REVISED JM 6-02-2022.pdf, 2. MEAD & HUNT Agreement PW2020-09
TO: Mayor and Commission AGENDA DATE: 7/5/2022

FROM: John A. Peters, III, PE, Acting City Manager AGENDA ITEM: 8 - D

SUBJECT:
Title
Request approval of the Task Authorization with Mead & Hunt to design and permit the replacement of Lift Station #7 Waycross in accordance with their agreement #PW 2020-09 for Continuing On-Call Water & Wastewater Utility Line Engineering Services in the amount of $109,076.00. - Steven Danskine, PE, Public Works/Deltona Water (386) 878-8998.

Strategic Goal: Infrastructure

Body
LOCATION:
Lift Station #7 - Waycross

BACKGROUND:
Background
This project will replace the undersized and outdated Lift Station #7 on Waycross Circle with a new pump station that will have an emergency power generator, updated telemetry cabinet that will tie into our existing SCADA system, new pumps and new panel box. This design also includes a new grinder pump station, power supply and forcemain to serve two existing homes at the Waycross Circle cul de sac, one of which has been adversely impacted by multiple previous lift station failures. The existing Lift Station is sited on an existing utility easement adjacent to an existing single-family home. This home has been purchased by the City of Deltona for subsequent demolition to make room for the new Lift Station and emergency generator. The scope also includes re-routing a section of 10 inch forcemain on Providence Blvd that will be rerouted to Lift Station 9 Gainesville to decrease the pressure Lift Station 7 is pumping against. A simplified analysis of the pumping and wet well capacity of Lift Station 9 is also included as part of the task.

OPTIONS:
1. Approve the task authorization with Mead & Hunt to design and permit the
replacement of Lift Station #7 Waycross.
2. Deny the task authorization and continue to use outdated Lift Station and equipment.
End

COST:
$109,076

SOURCE OF FUNDS:
Water/Wastewater GL: 401650-650100-43024

ORIGINATING DEPARTMENT:
Public W...