File #: 15-5534    Version: 1
Type: Contract Status: Agenda Ready
File created: 8/6/2021 In control: City Commission
On agenda: 9/9/2021 Final action:
Title: Request for approval of the Task Authorization with Besh Halff Inc. for the design, permitting and pre-construction bidding services for Water Main Replacements, in accordance with their Agreement with the City of Deltona and RFQ# PW 2020-09 for Continuing On-Call Water & Wastewater Utility Line Engineering Services in the amount of $125,880.00. - Steven Danskine, Public Works/Deltona Water (386) 878-8998. Strategic Goal: Infrastructure
Attachments: 1. Fully Executed Agreement-BESH HALFF, RFQ# PW 2020-09-, 2. Partial Sign TA-BESH-Group 2,3,4 WM, 3. Copy of Fee Estimate Worksheet
TO: Mayor and Commission AGENDA DATE: 9/9/2021

FROM: John A. Peters, III, PE, Acting City Manager AGENDA ITEM: 11 - A

SUBJECT:
Title
Request for approval of the Task Authorization with Besh Halff Inc. for the design, permitting and pre-construction bidding services for Water Main Replacements, in accordance with their Agreement with the City of Deltona and RFQ# PW 2020-09 for Continuing On-Call Water & Wastewater Utility Line Engineering Services in the amount of $125,880.00. - Steven Danskine, Public Works/Deltona Water (386) 878-8998.

Strategic Goal: Infrastructure

Body
LOCATION:
Various parts of the City of Deltona

BACKGROUND:
Background
This project is to design, permit and provide pre-construction bidding services for replacement of water mains in various locations throughout the City of Deltona.

The City of Deltona has identified several areas in the city that is served by old pipes that are in need of replacement. Some of the pipes are asbestos concreate pipe and thin wall class pvc pipe that were installed in the 1960's and 1970's and are failing causing numerous water leaks.

Additionally some areas served by these pipes in the distribution system are too small to provide adequate fire protection. The 4 inch pipes will be upsized to 6 inch pipes to accommodate the installation of fire hydrants which in turn will improve fire protection in the area.

The City requested a proposal for the survey, design, permitting and construction administration for replacement of the following areas in Groups 2,3 and 4 totaling approximately 10,600 linear feet:

Group 2
1. 4" on Mayflower Ave from Arab St to Quail Roost St. - 1,200 LF
2. 4" on Eagles Nest Ave from Arab St to Quail Roost St. - 1,041 LF
3. 4" on Quail Roost St to Embassy Dr to Deltona Blvd. - 774 LF
Group 3
1. 4" on Brady Dr from Saxon Blvd to Persian St - 585 LF
2. 6" on Persian St from Brady Dr to Waycross Cir - 830 LF
3. 4" on Canfield Ter from Persian St to Saxon Blvd...