Deltona banner
File #: 15-5169    Version: 1
Type: Contract Status: Agenda Ready
File created: 4/7/2021 In control: City Commission
On agenda: 4/19/2021 Final action:
Title: Request approval of the Task Authorization with Dewberry Engineers for the Post Design Services for the Elkcam Paved Shoulders-Segment 1 project, in accordance with their Agreement with the City of Deltona and RFQ# PW 17-06 for On-Call Civil Engineering Services - Steven Danskine, Public Works/Deltona Water (386) 878-8998. Strategic Goal: Infrastructure/Transportation
Attachments: 1. Dewberry Rates- Package, 2. Dewberry Renewal through 01.31.22, PW 17-06, 3. Partial Sign TA & Scope Dewberry-Post Design Elkcam Paved Shoulders, 4. Dewberry Engineering LLC. - PW 17-06 Civil Engineering Agreement
TO: Mayor and Commission AGENDA DATE: 4/19/2021

FROM: John A. Peters, III, PE, Acting City Manager AGENDA ITEM: 11 - B
SUBJECT:
Title
Request approval of the Task Authorization with Dewberry Engineers for the Post Design Services for the Elkcam Paved Shoulders-Segment 1 project, in accordance with their Agreement with the City of Deltona and RFQ# PW 17-06 for On-Call Civil Engineering Services - Steven Danskine, Public Works/Deltona Water (386) 878-8998.

Strategic Goal: Infrastructure/Transportation

Body
LOCATION:
Elkcam Blvd. from Sylvia Dr to Fort Smith Blvd.

BACKGROUND:
Background
On February 23, 2021 the City opened bids on the Elkcam Boulevard Paved Shoulder project which includes adding a 5-foot paved shoulder to the two-lane Elkcam Boulevard section between Sylvia Drive and Ft. Smith Boulevard, a distance of 1.6 miles. Project elements include milling and resurfacing, paved shoulders, sidewalk construction, driveway reconstruction, minor drainage improvements, detectable warning surface installation, signage and thermoplastic pavement markings. In addition, mobilization, maintenance of traffic (MOT), erosion control, clearing and grubbing, earthwork, and sodding are also included as part of this project. P&S Paving, Inc. was determined to be the lowest responsible, responsive bidder at $1,062,300.62. Concurrence with FDOT has been obtained.

As the Engineer of Record on this project, Dewberry Engineers, Inc. is the preferred consultant for Post Design Services on this project for questions concerning their design, specifications and materials during construction.

End
COST:
$36,400.00

SOURCE OF FUNDS:
Transportation

ORIGINATING DEPARTMENT:
Public Works

STAFF RECOMMENDATION PRESENTED BY:
Steven G. Danskine, PE, Acting Director of Public Works - That the Commission approve the Task Authorization with Dewberry Engineers for the Post Design Services for the Elkcam Paved Shoulders-Segment 1 project, in accordance with the...

Click here for full text