File #: 15-5138    Version: 1
Type: Contract Status: Passed
File created: 3/25/2021 In control: City Commission
On agenda: 4/5/2021 Final action: 4/5/2021
Title: Notification of FDEP Consent Order OGC# 20-1509 for the Deltona Lakes Water Reclamation Facility along with proposed response activities - Steven Danskine, P.E., Public Works, 386-878-8998. Strategic Goal: 5 - Public Safety
Attachments: 1. LFCO_20-1509_Deltona Lakes, 2. City of Deltona Estimate Phase 2 Repair 10-27-2020, 3. Deltona Fisher WWTF Improvements Scope 03 16 21, 4. LS21 Energy Savings, 5. Energy Predictor Project, 6. Gravity Sewer Collection System Condition
TO: Mayor and Commission AGENDA DATE: 4/5/2021

FROM: John A. Peters, III, PE, Acting City Manager AGENDA ITEM: 8 - B

SUBJECT:
Title
Notification of FDEP Consent Order OGC# 20-1509 for the Deltona Lakes Water Reclamation Facility along with proposed response activities - Steven Danskine, P.E., Public Works, 386-878-8998.

Strategic Goal: 5 - Public Safety

Body
LOCATION:
Citywide

BACKGROUND:
Background
While performing the Permit Renewal for the Deltona Lakes Water Reclamation Facility (WRF), Facility ID No. #FLA111724, two separate events prompted action from the Florida Department of Environmental Protection (FDEP). Firstly, Discharge Monitoring Reports (DMR's) for the plant reported two quarterly exceedances for Total Nitrogen as Nitrate (Nitrate), one in 2019 and the second in 2020, nearly one year apart in an onsite monitoring well. Secondly, on September 21, 2020, during multiple consecutive torrential downpours, approximately 4,000 gallons of raw sewage overflowed a manhole adjacent to Lake Gleason. Each incident was reported to FDEP along with subsequent discussions of the causes and proposed remedies, and subsequently the aforementioned Consent Order (attached) was issued on March 1, 2021.

Conditions:
* An Infiltration & Inflow (I&I) Plan will be implemented by piggybacking on a Toho Water District contract with USSI, Inc. for smoke testing, manhole inspections/repair along with other minor repairs to the sanitary sewer collection system in order to reduce the likelihood of overwhelming the collection system's ability to function properly.
* Obtain design, permitting, and construction for plant modifications to eliminate discharge to the onsite storage pond.
Fines:
* Fines and Penalties total $9,263.20. $250.00 of which is administrative.
* In lieu of paying the $9,013.20 civil penalty, we may instead implement a Pollution Prevention (P2) Project in an equal or greater value.
* Staff intends to install to Variable Freque...