Title: Request for approval of Resolution No. 2026-41 and Task Authorization between the City of Deltona & Tetra Tech for engineering services to prepare construction drawings and obtain a permit modification for Pond GC-4 as part of the water quality mitigation improvements for the Theresa Basin Emergency High Level Overflow System in the amount of $75,938.
Attachments: 1. Task Authorization Resolution-Stormwater Pond, 2. SW Pond GC-4 Scope of Work & Task Authorization Tetra Tech

TO:  Mayor and Commission                                          AGENDA DATE:  5/4/2026

 

FROM:  City Manager                                          AGENDA ITEM:    7 - I                                                               

                                                                    

SUBJECT:                        

Title

Request for approval of Resolution No. 2026-41  and Task Authorization between the City of Deltona & Tetra Tech for engineering services to prepare construction drawings and obtain a permit modification for Pond GC-4 as part of the water quality mitigation improvements for the Theresa Basin Emergency High Level Overflow System in the amount of $75,938.

 

Body

LOCATION:

GC-4 Pond Location Whitewood Drive @ 11th Street WEST

 

COST:

$75,938

 

SOURCE OF FUNDS:

Stormwater

 

ORIGINATING DEPARTMENT:

Public Works/Stormwater Division

 

POTENTIAL MOTION:

Recommendation

“I move to approve Resolution No. 2026-41 and the Task Authorization between the City of Deltona & Tetra Tech for engineering services to prepare construction drawings and obtain a permit modification for Pond GC-4.”

END

 

BACKGROUND:

Background

As part of the approval process for the Theresa Basin Emergency Outfall system, extending from Doyle Lake to Lake Bethel, the City was required to develop a water quality mitigation plan to show good faith efforts in mitigating for increased nutrient loading into Lake  Monroe.  Tetra Tech developed a plan for the city showing tracts of land outside of the Theresa Basin, which could be used to construct water quality ponds and retrofit drainage improvements to help reduce nutrient loads. 

 

Proposed work in the Task Authorization includes surveying, geotechnical borings, ecological services, engineering design (hydraulic modeling, construction drawings/specifications & project manual), permitting & meetings.